Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Castro-Lacouture, D, Süer, G A, Gonzalez-Joaqui, J and Yates, J K (2009) Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method. Journal of Construction Engineering and Management, 135(10), 1096–104.

Chen, P, Qiang, M and Wang, J N (2009) Project Management in the Chinese Construction Industry: Six-Case Study. Journal of Construction Engineering and Management, 135(10), 1016–26.

El Asmar, M, Hanna, A S and Chang, C (2009) Monte Carlo Simulation Approach to Support Alliance Team Selection. Journal of Construction Engineering and Management, 135(10), 1087–95.

Hallowell, M R and Gambatese, J A (2009) Activity-Based Safety Risk Quantification for Concrete Formwork Construction. Journal of Construction Engineering and Management, 135(10), 990–8.

Ke, Y, Wang, S, Chan, A P and Cheung, E (2009) Research Trend of Public-Private Partnership in Construction Journals. Journal of Construction Engineering and Management, 135(10), 1076–86.

Lam, K, Ning, X and Lam, M C (2009) Conjoining MMAS to GA to Solve Construction Site Layout Planning Problem. Journal of Construction Engineering and Management, 135(10), 1049–57.

Ling, F Y Y, Pham, V M C and Hoang, T P (2009) Strengths, Weaknesses, Opportunities, and Threats for Architectural, Engineering, and Construction Firms: Case Study of Vietnam. Journal of Construction Engineering and Management, 135(10), 1105–13.

Moselhi, O and Alshibani, A (2009) Optimization of Earthmoving Operations in Heavy Civil Engineering Projects. Journal of Construction Engineering and Management, 135(10), 948–54.

Orabi, W, El-Rayes, K, Senouci, A B and Al-Derham, H (2009) Optimizing Postdisaster Reconstruction Planning for Damaged Transportation Networks. Journal of Construction Engineering and Management, 135(10), 1039–48.

Prasertrungruang, T and Hadikusumo, B H W (2009) Modeling the Dynamics of Heavy Equipment Management Practices and Downtime in Large Highway Contractors. Journal of Construction Engineering and Management, 135(10), 939–47.

Rajendran, S and Gambatese, J A (2009) Development and Initial Validation of Sustainable Construction Safety and Health Rating System. Journal of Construction Engineering and Management, 135(10), 1067–75.

Rajendran, S, Gambatese, J A and Behm, M G (2009) Impact of Green Building Design and Construction on Worker Safety and Health. Journal of Construction Engineering and Management, 135(10), 1058–66.

Shapira, A and Simcha, M (2009) Measurement and Risk Scales of Crane-Related Safety Factors on Construction Sites. Journal of Construction Engineering and Management, 135(10), 979–89.

Skibniewski, M J and Ghosh, S (2009) Determination of Key Performance Indicators with Enterprise Resource Planning Systems in Engineering Construction Firms. Journal of Construction Engineering and Management, 135(10), 965–78.

Taylor, J E, Levitt, R and Villarroel, J A (2009) Simulating Learning Dynamics in Project Networks. Journal of Construction Engineering and Management, 135(10), 1009–15.

Tsai, J and Chi, C S F (2009) Influences of Chinese Cultural Orientations and Conflict Management Styles on Construction Dispute Resolving Strategies. Journal of Construction Engineering and Management, 135(10), 955–64.

Wang, P, Mohamed, Y, Abourizk, S M and Rawa, A R T (2009) Flow Production of Pipe Spool Fabrication: Simulation to Support Implementation of Lean Technique. Journal of Construction Engineering and Management, 135(10), 1027–38.

  • Type: Journal Article
  • Keywords: Fabrication; Simulation; Lean construction; Construction industry;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000068
  • Abstract:
    Pipe spool fabrication is an important stage in industrial construction project delivery. It is a complex production system characterized by product uniqueness and high product mix, which pose challenges to the analysis and improvement of this system. This research applies lean production principles and flow production to shop fabrication, and uses a simulation-based approach as a tool to facilitate its implementation. The work described in the paper is based on a real case study undertaken with an Edmonton-based industrial construction contractor. The traditional batch-and-queue fabrication system and the new cell-based work flow fabrication systems were compared and analyzed. Simulation models were built to experiment with the old and new production systems and quantitatively test the effects of lean principles on the performance of the systems. The developed simulation-based approach proves a practical and more powerful tool than the value stream map for modeling and for quantitatively evaluating the performance of a complex and dynamic spool fabrication shop.

Wang, Y, Goodrum, P M, Haas, C T and Glover, R W (2009) Analysis of Observed Skill Affinity Patterns and Motivation for Multiskilling among Craft Workers in the U.S. Industrial Construction Sector. Journal of Construction Engineering and Management, 135(10), 999–1008.